BS 7671:2018+A4:2026, Amendment 4 to the IET Wiring Regulations, was published on 15 April 2026 and has been the only current version since 15 October 2026. It adds new rules on stationary batteries, functional earthing for ICT equipment, Power over Ethernet and protective neutral bonding, and changes the testing and certification forms. It is not what made plug-in solar legal; that came from SI 2026/848 and the Interim Product Specification (IPS). The plug-in rules still rely on BS 7671, however. The home's wiring must comply with it, and any change to a circuit to accommodate a plug-in kit is work for an electrician.
The key dates
| Date | What happened |
|---|---|
| 15 April 2026 | BS 7671:2018+A4:2026 published |
| 16 July 2026 | IPS v2 published; it lists BS 7671:2018+A4:2026 among its applicable standards |
| 27 August 2026 | SI 2026/848 in force: plug-in solar allowed through a 13 A socket in Great Britain |
| 15 October 2026 | Amendment 4 becomes the only current version; BS 7671:2018+A2:2022+A3:2024 withdrawn |
What changed in Amendment 4
According to NICEIC's summary, the main technical changes are:
- A new Chapter 57 on stationary secondary batteries used for electrical storage and for supplying installations. This is the chapter that matters for home battery systems.
- A new Section 545 on functional earthing and functional equipotential bonding for information and communication technology (ICT) equipment.
- A new Section 716 on Power over Ethernet.
- Protective neutral bonding (PNB) earthing systems, included for the first time.
- RDC protective devices, introduced for electric vehicle charging installations.
- A major revision of Section 710 (medical locations), and changes to Part 6 (inspection and testing), including the model forms and EICRs.
NICEIC's summary does not list any plug-in solar provisions among the changes.
How plug-in solar relates to BS 7671
The plug-in route is set by legislation and the product specification, not by the wiring regulations, but BS 7671 still applies at four points:
- Home wiring must still comply. Ofgem's G98 decision exempts plug-in devices from the installer-related G98 requirements, but states that these exemptions do not remove the requirement for the customer's installation to conform with BS 7671.
- Changes to a circuit are work for an electrician. The IPS requires the instructions to say that any testing or modification of the home's electrical system may only be done by professional electricians, in line with G98 and BS 7671. Where connecting the kit requires a change to the final circuit, such as replacing the overcurrent protective device under BS 7671 Regulation 551.7.2, the instructions must say so and identify it as work for a qualified electrician.
- Residual current protection. The IPS advises that the installation should be in good condition and have modern RCBO protection. Installations with older fuse protection and no RCBOs should be checked and, where necessary, upgraded by an electrician. Installations with MCBs and a shared upstream RCD may also be acceptable, subject to further testing by DESNZ.
- Ring final circuits. The government's response notes that the electrical safety study assessed plug-in solar on representative UK installations, including ring circuits. It did not identify safety concerns preventing safe operation of plug-in solar up to 800 W on appropriately protected ring circuits.
- SI 2026/848 and IPS v2make the plug-in route legal
- Kittype tested to G98, ENA register
- Home installationmust comply with BS 7671
- Electriciancircuit changes, RCBO upgrades
- Customerinstalls and notifies the DNO
Where installers still have work
Plug-in kits are designed for householders to install, but they still create work for electricians:
- Pre-installation checks. Many households will want the consumer unit, RCD protection and socket circuits checked before plugging in, especially where the fuse board is old or the circuit labelling is unclear. For kits with more than 960 W of panels, the IPS asks manufacturers to advise a professional assessment.
- Consumer unit upgrades. Replacing old fuse boards with RCBO protection, and making any change needed to the final circuit the kit will use.
- Periodic RCBO testing advice. The IPS asks manufacturers to tell users to press the RCBO test button periodically while the kit is producing, and to call an electrician if it does not trip immediately.
- Batteries. Plug-in batteries are not permitted. A household that wants storage needs a fixed-wired battery system, designed and installed to BS 7671 (which now includes Chapter 57) and notified to the DNO under G98 or G99.
- EV charging. Homes adding solar often add a charger too, and Amendment 4 introduces RDC protective devices for EV charging installations.
Frequently asked questions
Did Amendment 4 legalise plug-in solar?
No. Plug-in solar became legal in Great Britain on 27 August 2026 through SI 2026/848, which requires devices to meet the IPS. The IPS cites Amendment 4 as an applicable standard, but NICEIC's summary of the amendment does not include any plug-in solar provisions.
When did Amendment 4 come into force?
It was published on 15 April 2026 and became the only current version of BS 7671 on 15 October 2026, when the previous version was withdrawn.
Does a plug-in solar kit need an electrician?
Not for plugging it in, as the kit is designed for householder installation. An electrician is needed for any change to the home's circuits, such as replacing a protective device, and is advised where the installation is old, its circuits are not clearly labelled or it has no RCBO protection.
Is plug-in solar safe on a ring final circuit?
The government's response says that the electrical safety study, which included ring circuits, did not identify safety concerns preventing safe operation of plug-in solar up to 800 W on appropriately protected ring circuits.
What does Amendment 4 mean for home batteries?
It adds a new Chapter 57 on stationary secondary batteries. Plug-in batteries are outside the plug-in route, so a home battery is still a fixed-wired system installed by a competent installer.
What is new for EV charging in Amendment 4?
NICEIC's summary lists the introduction of RDC protective devices for electric vehicle charging installations. Check the regulation text for the detailed requirements.
How VaySunic can help
VaySunic develops microinverters, complete plug-in solar kits, home batteries and EV chargers at its R&D and manufacturing centre in China, and has its European headquarters in Germany. For UK installers and distributors we offer plug-in solar kits and, for the fixed-wired route, PowerCube home batteries installed by a qualified electrician. See our distributor programme, or read how the plug-in route works under the IPS.
Sources
- NICEIC, Understanding BS 7671:2018+Amendment 4:2026
- DESNZ, Plug-in Solar Device Interim Product Specification, Version 2.0, July 2026 (PDF)
- DESNZ, Plug-in solar: government response, July 2026 (PDF)
- Ofgem, Decision to approve DCRP/MP/26/02: amendment to G98 to facilitate plug-in microgeneration, 11 August 2026 (PDF)
- The Plugs and Sockets etc. (Safety) Regulations 1994 and Electricity Safety, Quality and Continuity Regulations 2002 (Amendment) Regulations 2026, SI 2026/848